PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

CMU layout at the 1st floor Bathroom 133-136 Facing West.jpg 2nd floor damper controllers Facing West.jpg Electrical roughing above the 2nd floor door frames Facing West.jpg Installed electrical split wire above the ceiling for the 2nd floor ENL Facing North.jpg Installed electrical split wire above the ceiling for the 2nd floor ENL Facing West.jpg
Next page CMU layout at the 1st floor Bathroom 133-136 Facing West
CMU layout at the 1st floor Bathroom 133-136 Facing West